Traffic resumes along Narayanghat-Munglin road section
Kathmandu / Jun 18: Vehicular movement along the Narayangadh-Muglin road section has resumed after 11 hours.
The road section was blocked by a landslide at Kali Khola at around 2 am on Sunday.
The debris has been removed with excavators and loaders resuming traffic along the road section.