Breakthrough in Nagdhunga evacuation tunnel
Bhauch Prasad Yadav / Dhading, Aug 7: The digging work of the evacuation tunnel of the Nagdhunga Tunnel Construction Project has been completed.
The evacuation tunnel’s breakthrough was done on Monday with the last blast by following the Nepali and Japanese cultures jointly.
The breakthrough was conducted in the presence of the Minister for Physical Infrastructure and Transport Prakash Jwala.